Conversions: DLP-515
363-205-401
Page 2 of 2
Issue 7, March 1997
7.
Are all indicators listed in Table A lighted during LED test?
If YES, then STOP. YOU HAVE COMPLETED THIS PROCEDURE.
If NO, then continue with Step 8.
8.
Are any of the indicators lighted during LED test?
If YES, then proceed to Step 4.
If NO, then continue with Step 9.
9.
Replace BCU with BCU removed previously.
10.
!
CAUTION:
Incorrectly set ADU option switches may result in immediate or future
loss of service or may introduce errors into the digital bitstream.
Replace ADU. Verify that option switch settings on replacement ADU agree
with option switch settings on ADU being replaced.
11. Press and hold LED TEST pushbutton on ADU.
12. Are all indicators listed in Table A lighted during LED test?
If YES, then STOP. YOU HAVE COMPLETED THIS PROCEDURE.
If NO, then continue with Step 13.
13. Are any of the indicators lighted during LED test?
If YES, then proceed to Step 4.
If NO, then continue with Step 14.
14.
!
CAUTION:
Incorrectly set ADU option switches may result in immediate or future
loss of service or may introduce errors into the digital bitstream.
Replace ADU with ADU removed previously.
15. Refer to SD-7C117-01 or SD-7C117-02. Repeat procedure from Step 1 after
locating and correcting trouble.