363-205-401
Power Up:
Issue 7, March 1997
Page 1 of 2
NTP-002
Acceptance
GENERAL
Acceptance tests are performed to ensure proper installation procedures have been
performed. The acceptance procedures are found in the Acceptance Tab of this
document. These procedures should be done before the equipment is turned up.