363-205-401
Power Up: DLP-502
Issue 7, March 1997
Page 5 of 6
19.
NOTE:
If voltage requirements are not met after replacement battery pack is
installed, original battery pack should be reinstalled in battery shelf.
Select another battery pack on battery shelf and repeat from Step 14.
20. Remove DMM test leads from battery shelf.
21. Have all battery shelves been equipped and tested?
If YES, then proceed to Step 23.
If NO, then continue with Step 22.
22. Go to next battery shelf and repeat from Step 4.
23. Install good 25-Amp fuses (Buss ABC or equivalent) into +BAT and
−
BAT
fuse holders of all battery shelves equipped with batteries (Figure 1).
24. If required, install good 5-Amp fuse into HTR (heater) fuse holder(s) of all bat-
tery shelves equipped with batteries (Figure 1).
25. Turn AC power circuit breaker on and ensure that AC power cord is connected
to power shelf plug (P112).
STOP. YOU HAVE COMPLETED THIS PROCEDURE.