background image

LUMBERG 
CONNECT

GMBH

Im Gewerbepark 2

58579 Schalksmühle

Processing Instruction 

Circular connectors

AISG – Next Generation

03V01EN

Page 11 of 15

Step 10: Tighten the cap nut

Use the assembly wrench 0380 and an 18 mm open-end wrench or two 18 mm open-end 
wrenches

Tightening torque 3 Nm

Summary of Contents for 032200

Page 1: ...ksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 1 of 15 032200 033200 036000 036500 Date Name Edition 1 2 3 4 5 6 Author 09 03 16 fs Name fs fs fs fs Checked 01 07...

Page 2: ...tors AISG Next Generation 03V01EN Page 2 of 15 Alteration Description Edition Alteration carried out 1 Stripping lengths and tightening torques revised 2 Stripping lengths revised 3 Processing instruc...

Page 3: ...V01EN Page 3 of 15 Contents 1 Product types 4 1 1 Part description 5 2 Assembly instructions 6 3 Disassembly instructions 13 4 Quality assurance 14 4 1 Quality features 14 4 2 Stripping 14 4 3 Assembl...

Page 4: ...pling optimized assembly protected against vibration shielded with solder connection for cable diameters up to 10mm Acc to data sheet 032200 01 Acc to data sheet 033200 01 Crimp variants 036000 036500...

Page 5: ...Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 5 of 15 1 1 Part description crimp contacts solder contacts insulation sleeve contact carrier rear component s...

Page 6: ...CT GMBH Im Gewerbepark 2 58579 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 6 of 15 2 Assembly instructions Step 1 Strip the cable Step 2 Expose the braide...

Page 7: ...BH Im Gewerbepark 2 58579 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 7 of 15 Step 3 Thread through the rear component and the insulating sleeve Step 4 Co...

Page 8: ...8579 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 8 of 15 Step 5 Snap in the insulating sleeve and close it Step 6 Push the contact carrier in the front ho...

Page 9: ...BH Im Gewerbepark 2 58579 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 9 of 15 Step 7 Insert the front seal Only for couplings Step 8 Visual check for posi...

Page 10: ...werbepark 2 58579 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 10 of 15 Step 9 Screw on the housing Use the assembly wrench 0380 and an 18 mm open end wren...

Page 11: ...79 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 11 of 15 Step 10 Tighten the cap nut Use the assembly wrench 0380 and an 18 mm open end wrench or two 18 mm...

Page 12: ...LUMBERG CONNECT GMBH Im Gewerbepark 2 58579 Schalksm hle Processing Instruction Circular connectors AISG Next Generation 03V01EN Page 12 of 15 Step 11 The assembly is completed...

Page 13: ...ng Instruction Circular connectors AISG Next Generation 03V01EN Page 13 of 15 3 Disassembly instructions Step 1 Loosen the cap nut Caution The cap nut must be loosened using two 18 mm open end wrenche...

Page 14: ...res must be taken into consideration Stripping Assembly sequence Location of seals Tightening torques Important recommendations and notices 4 2 Stripping The user must ensure that the individual wire...

Page 15: ...Storage conditions The parts should ideally be stored in the original packaging at a constant temperature of 21 25 C with a relative humidity of no more than 55 The components should not be exposed to...

Reviews: