7 OPERATION/USE
LUMINELL SWEDEN AB
54
7.7 PREVENTIVE MAINTENANCE PLAN
Preventive maintenance tasks shall be done according to the following plan:
Task
Frequency
Perform a function test.
Start up the searchlight system, rotate the searchlight in horizontal and
tilt the vertical direction up/down a few times.
Every week if not
used during this
period.
Make visual inspection of the searchlight housing
.
Look for any potential mechanical damage caused by external force.
A damage can lead to reduced or non-functionality.
Every month
Clean the searchlight housing.
Rinse carefully with fresh water to wash away the salt deposits.
If dirtier, use a very soft sponge and soap that is not caustic, contains
strong solvents such as acetone or thinner base.
Ensure that the heatsink is kept free of dirt and debris as this affects
the cooling capacity.
Avoid washing the searchlight with high pressure water as this
can lead to penetration inside the housing followed by potential
electrical and mechanical problem.
Every six month
Make a visual inspection of the searchlight front glass.
Verify that the glass is without any cracks or deep scratches.
A crack can lead to water penetration inside the housing followed by
potential electrical and mechanical problem.
Scratches can reduce light performance.
Every 12 months
Replacing the tilt drive belt
(see spare parts list)
Every 7 years
Deicing
.
Wintertime the system should be deiced with caution. First turn the
lights on to let the heat melt the ice before operating the system
horizontally and vertically.
When necessary
Summary of Contents for SL1
Page 7: ...LUMINELL SWEDEN AB 7 ...
Page 19: ...6 Install the Product LUMINELL SWEDEN AB 19 Mechanical drawing SL1 ...
Page 20: ...6 Install the Product LUMINELL SWEDEN AB 20 Mechanical drawing SL1 base measurements ...
Page 21: ...6 Install the Product LUMINELL SWEDEN AB 21 6 2 MECHANICAL INSTALLATION OF OPERATOR PANEL ...
Page 22: ...6 Install the Product LUMINELL SWEDEN AB 22 Mechanical drawing Operator panel ...
Page 23: ...6 Install the Product LUMINELL SWEDEN AB 23 Mechanical drawing Operator panel base ...
Page 24: ...6 Install the Product LUMINELL SWEDEN AB 24 6 3 SL1 ELECTRICAL SL1 electrical system overview ...
Page 26: ...6 Install the Product LUMINELL SWEDEN AB 26 Connection example 2 24Vdc ...
Page 66: ...12 Declaration of conformity CE LUMINELL SWEDEN AB 66 12 DECLARATION OF CONFORMITY CE ...
Page 67: ...13 type approval certificate DNV LUMINELL SWEDEN AB 67 13 TYPE APPROVAL CERTIFICATE DNV ...
Page 68: ...13 type approval certificate DNV LUMINELL SWEDEN AB 68 ...
Page 69: ...13 type approval certificate DNV LUMINELL SWEDEN AB 69 NOTES ...
Page 70: ...13 type approval certificate DNV LUMINELL SWEDEN AB 70 NOTES ...
Page 71: ...13 type approval certificate DNV LUMINELL SWEDEN AB 71 NOTES ...
Page 72: ...Luminell Sweden AB Seldonsvägen 8 SE 302 62 Halmstad Sweden Phone 46 35 38280 www glamox com ...