| + 44(0)208 144 1694 | Info@Lumishore.com
Lumishore USA 7137 24TH Court East Sarasota, Florida 34234 | (941) 405-3302 | Sales@LumishoreUSA.com
Lumishore UK, Unit D12, Upper Fforest Way, Swansea Enterprise Park, Swansea, SA6 8QR
7
Electrical installation - SUPRA Lumi-Hub
Note: This option requires a Lumishore SUPRA i-Connect Hub (60-0317) and SUPRA i-Connect Switch
(60-0318). The SUPRA i-Connect Hub is Lumi-Link compatible which allows control via certified MFD or
connected device (SUPRA Bridge PN: 60-0368) - See SUPRA Bridge installation manual for further details.
Plan the installation first. Work out where the lights will be mounted. Each light connects to the hub using a
field installable connector (supplied). One hub can power up to 4 lights, and 4 hubs can be connected
together in one system. The hub should be mounted between the lights and the power source. Plan the
cable routes, including the switch, prior to installation. Ensure all cables are marine grade, and are correctly
rated for TOTAL current, and voltage.
Warranty
Battery /
PSU
12 or 24 V
Supra Lumi-
Hub
On/Off
Scene
Supra Lumi-Switch
Field Installable
Connectors (Supplied)
Removable
Fuse Cover
Fuse or
Circuit
Breaker