© PROPERTY OF LUNDIX IT SWEDEN, ALL RIGHTS RESERVED – THE DISCLOSURE OR OTHER COMMUNICATION, COPYING, REPRODUCTION AND ANY USE WHATSOEVER IS FORBIDDEN WITHOUT THE WRITTEN AUTHORIZATION
OF LUNDIX IT.
SPC SmartBox User Manual
Revision
1.1
Page
14 of 62
Reference
2017-110
Panel and have a corresponding web password.
4.1.5
Sync SmartBox and SPC
After you have setup the SPC communication you need to import the areas, zones and outputs
configuration of the SPC panel to SPC SmartBox object database. Go to
Configuration->Object
Database
, select
SPC
and click on
Sync Database with SPC Panel
. The areas, zones and outputs of the
SPC panel should then appear in the database listing. See example below.
To test the SPC communications go to
Alarm Areas
,
Alarm Zones
and
Alarm Outputs
in the
Automation
main menu.
4.1.6
Conclusion
You may now configure the SmartBox with Z-wave or/and KNX devices. You may also configure
scenes or the dashboard.
NOTE! Every time you change the settings of areas, zones or outputs in the SPC panel you need to
update SPC SmartBox Object Database by using the
Sync Database with SPC Panel
.