5. POWER SUPPLY from DC
ADAPTER
The meter also can supply the power supply from the
DC 9V power adapter ( optional ). Insert the plug of
power adapter into " DC 9V Power Adapter Input Socket ".
6. BATTERY REPLACEMENT
When the lower left of LCD display show " "
﹐
it is
necessary to replace the battery.
However, in-spec
﹒
measurement may still be made for
several hours after low battery indicator appears before the
instrument become inaccurate
﹒
When the display
show " batt " and the power will be shut down.
7. OPTIONAL ACCESSORIES
SMD TESTER
Model : SMDA-22
* Optional SMD tester for LCR-9184, LCR-9183.
* Useful tool for SMD components ( Resistor,
Capacitor,Inductor ) LCR value measurement.
11