Step by Step Installation Instructions for Softswitch128
TM
System 11
Step 6
Activate Loads in Bypass
A. Complete load wiring.
B. Check that the bypass jumpers are in place.
These jumpers protect the switch mechanism from
load faults and must be used to check load wiring
when it is installed or modified.
Warning!
Verify that the Softswitch128
panel is fed from the correct voltage. A
feed miswire or loss of a feed neutral
can cause overvoltage damage to the
equipment.
C. Turn a load’s input circuit breaker ON.
The load should energize, the breaker should not
trip, and total load current must be within the
circuit breaker's limit and less than 16 A.
D. Repeat ‘C.’ for each circuit with completed
load wiring.
L
SL
L
SL
L
SL
L
SL
AC RMS
Current Meter
Load Circuit Wiring
Activate Loads in Bypass
Live
Switched Live
Please Note:
If onsite Factory Commissioning was purchased with the Softswitch128 System, you may want to stop
here and complete the
Control Location, Panel, and Control Station Tables
that are located in the back of the
Softswitch128 Setup and Maintenance Guide
. Once those tables are completed, please call 1.800.523.9466 and
select Scheduling to schedule a field service visit. Allow for 10 working days before a field service technician will visit.
If onsite commissioning was not purchased or if Telephone Startup was purchased, please continue the installation
process.