I N S T A L L A T I O N   G U I D E

4

5

6

STEP 2-3 (Conduit-surface) (Figure 4)

1. Drill holes on the rear cover as auxiliary mounting holes.
2. Verify that supply power is off. Using a contractor level, ensure rear cover is level 
and mark mounting surface thru selected ausiliary mounting holes.
3. Drill holes as marked in Step 1 and install appropriate mounting inserts capable of 
handling fixture load requirements.
4. Ensure rear cover is level. Fully tighten fasteners (use washers as required to 
ensure a secure fit).
5. Attach 1/2” NPT conduit fittings using the appropriate EMT rain tight compression 
connections (not provided) onto the factory machined conduit entry opening.

STEP 3

Make supply wire (power and dimming) to fixture wire connections as required thru 
splice access. Universal voltage driver permits operation at 120V thru 277V, 50 or 
60Hz 0-10V control wires must be rated for 300V minimum. For 0-10V Dimming, 
follow the wiring directions as shown on the figure to the left.

STEP 4 (Figure 5)

Fixture slightly upward, align fixture housing indicators with rear cover hooks and 
slip fixture back onto hooks and insert the connector.

STEP 5 (Figure 6)

Close the housing indicators to the rear cover and fully tighten fasteners.

BLACK

WHITE

GREEN

PURPLE 

GRAY

LINE

COMMON

GROUND

DIM+

DIM-

Conduit

Rear Cover

Housing Indicators

Auxillary

Mounting Holes

Supply Wire

Rear Cover

Rear Cover

Screws

TROUBLESHOOTING

If this fixture fails to operate properly, check to make sure: The fixture is wired correctly. The fixture is grounded correctly. The line voltage at the fixture is correct. If all these 
variables have been checked and the fixture still does not operate as specified, contact your local distributor.