139-0647-01.10
Chapter Three--Quick Start Guide
10
Steps
Reference
1. Connect power to each 20A IEC input.
Input 1 must be connected to a power source
during programming and operation.
Chapter 1--Back Panel Overview
2. Connect the controller to a computer or
network for panel setup.
Chapter 4--Wiring
3. Access the web page by entering the
displayed IP address or NetBIOS name into
web browser on a connected computer.
Chapter 5--Control Setup
4. Complete the setup.
Chapter 5--Control Setup
5. Connect the controller to a secondary
controller or add contact closures if
necessary.
Chapter 4--Wiring
Chapter 5--Control Setup
Chapter Three--Quick Start Guide
INTRODUCTION
This chapter is a quick reference listing the steps necessary
to install the NPAC system. The steps in this chapter
are provided as an installation checklist. For complete
installation instructions, refer the chapter listed.
Note: The NPAC is factory programmed to place all relays in Zone 1 and in a brownout condition.
Applying power to input #1 will start brownout recovery sequence and power all outlets on.