Lynx
Page 7
Rev. 3/06/08
What you need to Supply
What you need to Supply:
1. Heater post anchoring hardware.
2. Materials necessary to construct a concrete base for floor mounting.
3. Gas supply line that is installed to the Gas and Electric Supply according to the:
National Fuel Gas Code, ANSI Z.223.1 (NFPA 54) in the US and CAN/CGA
B149.1 and B149.2 Installation Codes in Canada.
4. Electrical supply rated at 24 Vac with two stage control