MM102225V1, Rev. B
36
4.7 INSPECTION
In this section, the location of the installation is recorded and equipment configuration
parameters are verified against the As Built. In addition, general workmanship and
quality of assembly and installation are inspected
NOTE
Only selected parameters are checked against the recorded factory configuration as all
parameters are programmed into equipment before leaving the factory and hence should
not require to be modified.
4.7.1
Pre-test Inspection
Objective:
To verify that the site installation has been satisfactorily completed and that
newly installed cable interfaces have been correctly connected, especially inter-rack
cabling disconnected during shipment.
NOTE
Before commencing this section of tests,
ENSURE THAT ALL RACK CIRCUIT
BREAKERS ARE IN THE OFF POSITION.
PRE-TEST
INSPECTION
ACTION
MISCELLANEOUS
1.
A two rack three channel base station is
as shown in the figure to the right. Rack
1 (on left) contains system transceivers,
communication interfaces and control
and monitoring equipment; Rack 2 (on
right) contains transmit path RF power
amplifiers and combining equipment
.
Summary of Contents for P5100 Series
Page 2: ...Installation Manual MM102225V1 Rev B Jul 05 Base Station Tower Site ...
Page 70: ...MM102225V1 Rev B 69 This page intentionally left blank ...
Page 72: ...MM102225V1 Rev B 71 This page intentionally left blank ...
Page 74: ...MM102225V1 Rev B 73 This page intentionally left blank ...
Page 76: ...MM102225V1 Rev B 75 This page intentionally left blank ...
Page 82: ...MM102225V1 Rev B 81 PARAMETER VALUE EXPLANATION password cisco login end buck40sas ...
Page 92: ...MM102225V1 Rev B 91 This page intentionally left blank ...
Page 94: ...MM102225V1 Rev B 93 This page intentionally left blank ...
Page 96: ...MM102225V1 Rev B 95 This page intentionally left blank ...
Page 99: ...MM102225V1 Rev B 98 This page intentionally left blank ...