background image

 

Features 

 

A lightweight, soft sided padded case with a zippered top closure. 

 

An inner Lexan* container protects the wire.  

 

A center mounting post with hold down fitting. 

 

Binding posts for both the core wire and the test lead wire which connects to the 
meter. 

 

Large exterior fabric loop for attachment to virtually any type of waist belt 
support. 

 

A smooth feed through grommet allows the wire to pay out freely. 

 

 

 

 

Set Up Procedure 

 

(Fold abrasive screen in half and pull copper wire between halves to remove insulation) 

1) 

Unzip the top portion of the padded pack and fold it back. 

2) 

Unscrew the wire spool and hold down fitting with the core wire binding post attached. 

3) 

Carefully pull out (partially only) the center core wire tail from the spool. Carefully scrape the 

insulation from about one inch of the tail end. 
4) 

Unwind the trailing end of the wire from around the spool. Feed this end up through the 

opening (trailing wire feed through) in top portion of the Hip Pack. 
5) 

Insert the plastic wire spool over the aluminum spool support. Make sure that the center core 

wire tail end is facing UP. 
6) 

Screw on the spool lock down fitting and securely tighten. 

7) 

Slip the insulation-free end of the core wire between the jaws of the binding post. Tighten the 

terminal down on the wire to make a firm contact. This creates continuity between the spool of wire, 
the aluminum spool support, and the meter lead binding post. 
8) 

After the connection is tight, make certain that all loose wire from the core is securely and 

neatly tucked away. 
9) 

Close the zippered top portion of the hip pack, making sure not to tangle any of the wire 

inside. 
1O) 

Secure the pack to a belt using the loop provided on the hip pack. 

 

 

Reviews: