INSTALLATION PROCEDURES
■
GENERAL PROCEDURE
1) Assign and set Station Numbers to all units.
2) Connect the power supply.
3) Connect the transmission cables.
4) Connect all other external I/O devices.
■
COMPONENT IDENTIFICATION
Power LED Indicator
RUN LED Indicator
Fiber Link Connector
(Station Address Setting
Rotary Switches)
SA1
SA2
Specifications
I / O Terminal
Release Tab
RUN Output
Terminating Resistor
Power Supply Terminals
Transmission Line
Euro Type
Connector
Terminal
DLA1
5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201 Fax: +81(6)6659-8510 E-mail: info@m-system.co.jp
EM-6510 Rev.1 P. 2 / 14