background image

M1EAXV-2

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201  Fax: +81(6)6659-8510  E-mail: info@m-system.co.jp

EM-5995-A  Rev.1  P. 6 / 6

WIRING INSTRUCTIONS FOR BASE

 

SCREW TERMINAL

Torque: 0.5 N·m

 

SOLDERLESS TERMINAL

Refer to the drawing below for recommended ring tongue 
terminal size.  Spade tongue type is also applicable.
Recommended manufacturer: Japan Solderless Terminal 
MFG.Co.Ltd, Nichifu Co.,ltd (Solderless terminals with in-
sulation sleeve do not fit)
Applicable wire size: 0.25 to 1.65 mm

2

12max

6max

3max

4min

3.2 dia.

(mm)

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Power input voltage:  Check voltage across the terminal 

19 – 20 with a multimeter.

3) Input:  Check that the input signal is within 0 – 100% of 

full-scale.

4) Alarm operations:  Check the alarm operations referring 

to the figure below.

5) Output load:  Check that the output load is 250 V AC/ 120 

VA or 125 V DC/30 W at the maximum.

  For maximum relay life with inductive load, external pro-

tection is recommended.

LL

L

HH

H

Input

%

• Example   Quad N.O. contacts (LL, L, H, HH)

Alarm Trip Operation

Trip operation in power failure
   Output code 2: All relays turn OFF.
   Output code 3: All relays turn ON.
   Output code 5: Terminals 13 – 15, 16 – 18, 16 – 12, 
                             1 – 7 turn ON.

0

50

100

L2

L3

L4

L1

ON

ON

OFF

ON

ON

OFF

OFF

OFF

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Warm up the unit for at least 10 minutes.

• H (HH) Setpoint

  Increase the input signal from a value lower than the set-

point and check that the relay trips at the setting value.

• L (LL) Setpoint

  Decrease the input signal from a value higher than the 

setpoint and check that the relay trips at the setting val-
ue.

• Input Value

  Apply 0%, 25%, 50%, 75% and 100% input signal.  Per-

form input fine adjustment when input value is out of 
accuracy on the display. 

Refer to the operating manual (EM-5995-B), when adjust-
ing with front buttons.  Refer to the M1EACFG users man-
ual (EM-5994), when adjusting with M1EA Configurator 
Software (model: M1EACFG).  And then follow the proce-
dure shown below. 

• INPUT FINE ADJUSTMENT

1) Set the input signal to 0 %, and adjust the input display 

to 0 % by [80]/[180] Input Zero fine adjust.

2) Set the input signal to 100 %, and adjust the input dis-

play to 100 % by [81]/[181] Input Span fine adjust.

3) Again set the simulated input to 0 %, confirm the input 

display.

4) If input display is shifted, repeat the procedure from 1) to 

3).

LIGHTNING SURGE PROTECTION

M-System offers a series of lightning surge protector for 
protection against induced lightning surges.  Please contact 
M-System to choose appropriate models.

Reviews: