5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201 Fax: +81(6)6659-8510 E-mail: info@m-system.co.jp
EM-5490-Y2 P. 1 / 4
INSTRUCTION MANUAL
INSTALLATION BASE
(16 positions, Yokogawa DCS MAC2 / PAC card use / M3.5 screw terminal)
MODEL
M8BS-16Y2
BEFORE USE ....
Thank you for choosing M-System. Before use, please check
contents of the package you received as outlined below.
If you have any problems or questions with the product,
please contact M-System’s Sales Office or representatives.
■
PACKAGE INCLUDES:
Installation base ..................................................................(1)
■
MODEL NO.
Confirm Model No. marking on the product to be exactly
what you ordered.
■
INSTRUCTION MANUAL
This manual describes necessary points of caution when
you use this product, including installation, connection and
basic maintenance procedures.
POINTS OF CAUTION
■
POWER INPUT RATING & OPERATIONAL RANGE
• Locate the power input rating marked on the product and
confirm its operational range as indicated below:
85 – 132V AC rating: 85 – 132V, 47 – 63 Hz, ≥ 130VA
170 – 264V AC rating: 170 – 264V, 47 – 63Hz, ≥ 130VA
24V DC rating: 24V ±10%, ≥ 2.5A
■
GENERAL PRECAUTIONS
• Before you remove the unit from the base or mount it,
turn off the power supply and input signal for safety.
■
ENVIRONMENT
• Indoor use.
• When heavy dust or metal particles are present in the
air, install the installation base inside proper housing and
ventilate it.
• Do not install the base where it is subjected to continuous
vibration. Do not subject the unit to physical impact.
• Environmental temperature must be within 0 to 55°C or
32 to 131°F (0 to 50°C or 32 to 122°F for AC power) with
relative humidity within 30 to 90% RH in order to ensure
adequate life span and operation.
• Be sure that the ventilation slits are not covered with ca-
bles, etc.
■
WIRING
• Do not install cables close to noise sources (relay drive
cable, high frequency line, etc.).
• Do not bind these cables together with those in which
noises are present. Do not install them in the same duct.
• Be sure to close the terminal cover for safety.
■
AND ....
• The unit is designed to function as soon as power is sup-
plied, however, a warm up for 10 minutes is required for
satisfying complete performance described in the data
sheet.
COMPONENT IDENTIFICATION
■
REAR VIEW
Specifications
MOUNTING REQUIREMENTS
unit: mm (inch)
465 (18.31)
4–M5 SCREW
50 (1.97)