background image

RZMS-U9

5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201  Fax: +81(6)6659-8510  E-mail: info@m-system.co.jp

EM-7602  Rev.11  P. 8 / 8

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Power input:  Check supply voltage.
3) Input:  Check that the input is within 0 – 100% of full-

scale.

ADJUSTMENT PROCEDURE

This unit is calibrated at the factory to meet the ordered 
specifications, therefore you usually do not need any cali-
bration.   However, PC Configurator Software RZMSCFG is 
available to trim zero and span if such needs arise in order 
to adjust the input sensor range.
For RTD measuring, wire resistance can be compensated on 
site using the RZMSCFG.

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Warm up the unit for at least 10 minutes.  Apply 0%, 25%, 
50%, 75% and 100% input signal.  Check that the output 
signal for the respective input signal remains within accu-
racy described in the data sheet.  When the output is out of 
tolerance, please contact M-System’s Sales Office or repre-
sentatives.

Summary of Contents for RZMS-U9

Page 1: ...e distances are maintained to con form to CE requirements Failure to observe these re quirements may invalidate the CE conformance The actual installation environments such as panel con figurations co...

Page 2: ...ve The potential of the open terminal C against the FG equals to that of the last scanned channel If ch 2 and ch 3 are not connected the accuracy of ch 4 measurement is affected by potential differenc...

Page 3: ...C port COM1 through COM5 supported LAN card LAN card by Windows 1 External e g SCSI devices may impair appropriate performance MSR128LS MSR128LV MSR128LS MSR128LV PC IBM PC AT or compatible Operating...

Page 4: ...on ALM Alarm LED Amber LED turns on when the alarm contact output turns on NODE ADDRESS SETTING ROTARY SW 1 through F Setting at the power startup is recognized as the module s node address 0 Setting...

Page 5: ...module from sliding down is recommended WALL MOUNTING Set the body so that its DIN rail adaptor is at the bottom Pull down the DIN rail adaptor Refer to EXTERNAL DIMENSIONS TERMINAL CONNECTIONS Connec...

Page 6: ...ion line via twisted pair cable when there is no cross wiring close across the terminal T2 T3 with the attached jumper pin or with a leadwire When the device is not at the end remove the jumper pin No...

Page 7: ...des the connections shown with solid lines in the figure below 2 Pins No 8 are not connected between each other May cause breakdowns Interlink or Reverse cables are usually applicable Pin Assignments...

Page 8: ...ifications therefore you usually do not need any cali bration However PC Configurator Software RZMSCFG is available to trim zero and span if such needs arise in order to adjust the input sensor range...

Reviews: