Your locomotive can be configured to operate on 2-Rail or 3-Rail track. From the
factory the locomotive is configured to operate on 3-Rail Track. To configure the
locomotive for 2-Rail track operation, please do the following:
1. Remove the center rail pickup roller assemblies
2. Change the power input from 3-Rail to 2-Rail as seen in figure below.
Premier ES44AC Diesel Engine with PS-2 and Proto-Scale 3-2
5
Configuring Locomotive for 2-Rail or 3-Rail Operation
2-Rail/3-Rail Switch
3-Rail Pickups
3-Rail Pickups
2-Rail/3-Rail Operation