2.4 Specifications
①
Max apparent power from the grid means the maximum power imported from the utility grid used to satisfy the backup loads and charge the
battery.
②
The output power will exceed the rated value only when the power in the PV array is sufficient, and the duration of the overload is relating to
the overload power.
③
Single-phase peak output power is the single-phase max output that won’t trigger overload protection, only 1 phase can reach peak output
power at the same time.
Model
6kW-3P
8kW-3P
10kW-3P
12kW-3P
Efficiency
Max. Input Power (W)
7,800
10,400
13,000
15,600
Start-up Voltage (V)
180
180
180
180
Max. DC Input Voltage (V)
1,000
1,000
1,000
1,000
Rated DC Input Voltage (V)
620
620
620
620
MPPT Voltage Range (V)
200-850
200-850
200-850
200-850
No. of MPP Trackers
2
2
2
2
No. of PV Inputs
1/1
1/1
1/1
1/1
Max. Input Current (A)
13/13
13/13
13/13
13/13
Max. Short-circuit Current (A)
18/18
18/18
18/18
18/18
Battery
Battery Type
Lithium Battery (with BMS)
Battery Communication Mode
CAN / RS485
Battery Voltage Range (V)
180-750
Max. Charge/Discharge Current (A)
25/25
Rated Current of Built-in Fuse (A)
63
Output(Grid)
Rated Output Power (kW)
6
8
10
12
Max. Output Power (kW)
6.6
8.8
11
13.2
Max. Input Apparent Power (kVA)
12
①
16
①
16.5
①
16.5
①
Max. Charging Power of Battery (kW)
6
8
10
12
Rated Output Voltage (V)
3 / N / PE, 230(400)
Rated AC Frequency (Hz)
50/60Hz 45-55Hz/55-65Hz
Max. Output Current (A)
10
13.3
16.5
20
Power Factor
0.8 leading …0.8 lagging
Max. Total Harmonic Distortion
<3% @Rated Output Power
DCI
<0.5%In
Output(Back-up)
UPS Switching Time
<10ms
Max. Output Apparent Power (kVA)
6.6
8.8
11
13.2
Peak Overload Apparent Power (kVA)
12
②
,
60s
16
②
,
60s
20
②
,
60s
20
②
,
60s
Single-phase Peak Output Power(kVA)
2.6
③
3.3
③
4
③
5
③
Nominal Output Voltage (V)
230(400)
230(400)
230(400)
230(400)
Nominal Output Frequency (HZ)
50/60
50/60
50/60
50/60
Output THDv(@Linear Load)
<3%
<3%
<3%
<3%
Parallel Capability
Max. 10 inverters can be paralleled at grid-side, back-up ports can be paralleled by
firmware update later