Assembly of the 75-5AS is easy! There are 5 ELEMENT ASSEMBLIES,  each one marked with 
a different color. There are 5 differently colored bands on the 2” X 104” BOOM that indicates 
the mounting position of the element assembly with the matching color. The steps below outline 

the assembly process and the correct hardware to use. 
 
1. Install quantity 4, 1/4-20 x 1/2” ss square head set screws into the top of each ring clamp and one in the side. 
 
2. Sort the elements by length and color code into pairs.  One pair at a time, insert the open end of each element into the 
ring clamp till ti bottoms onthe center roll pin. Tighen the set screws and repeat for the other element half. Continue until all 
the element pairs are mounted on the ring clamps. The color bands should be near the ring clamps and the corked element 
end should be out. 
 
3.  Mount the 'T' MATCH ASSEMBLY BLOCK to the bottom of the boom using the 1/4” hole at 35” from the rear of the 
boom, and a single 1/4-20 x 2-1/4” bolt with a 1/4” star washer under the head of the bolt. Orient the two balun connectors 
towards the From of the boom. 
 
4. Rotate the boom until the ‘T’ match assembly is on top. With the element tubes on the bottom, slide the ELEMENT 
ASSEMBLIES  onto the boom from both ends and position directly over the matching colorband. Spread the ring clamp 
fingers with a flatbladed screwdriver, if necessary, to ease the movement on boom. Loosely add a 1/4-20 x 1” bolt / locknut 
and  a 1/4-20 x 1/2” squarehead set screw to each ringclamp. Do not tighten yet. 
 
5. Loosely add two 8-23 x 1/4” setscrews and one 1/4-20 x 1/2” squarehead  screw to each SHORTING BAR.  Slide the 
shorting bars down toward the “T” match assembly on the DRIVEN ELEMENT tubes and onto the ‘T’ MATCH  rods. 
Position them according to the Dimension Sheet: The  measurement is from the outer face of the ‘T’ match block to the 
inner face of the shorting bar. Align the rods parallel with the element sections and tighten  all setscrews. A 5/64” Allen 
wrench has been provided for the smaller setscrews. 
 
6. Push the DRIVEN ELEMENT ASSEMBLY against the ‘T’ match block and tighten the 1/4-20 x 1” bolt and locknut to 
secure the element. Tighten the 1/4-20 x 1/2” squarehead setscrew, to ground it. 

   
7. Align the remaining four PARASITIC 
ELEMENT ASSEMBLIES  parallel to the 
DRIVEN ELEMENT ASSEMBLY.  Tighten the 
1/4-20 x 1” clamp bolts and the 1/4 x 1/2” 
setscrews. 
 
8. Align the other four elements and tighten the 
1/4-20 X 1”  bolt and locknut on each element. 
Check to be sure all elements are aligned and 
now tighten the square head 1/4-20 X 1/2”  set 
screws on each element. 
 
9. Before installing the balun, thread a 3/8-32 
SEAL NUT all the way onto both block 
connectors, black Neoprene side facing out. 
Attach balun and tighten connectors 

gently 

using a 7/16” end wrench. Then back the Seal 
Nuts out and finger-tighten firmly up against the 
face of the connectors (or tighten gently with 1/2” 
end wrench). Secure balun coil to the boom with 
two nylon cable ties. If the feed connector will be 
inaccessible after installation, install a feedline 
section reaching a convenient point. 