- 16 -
Phase 1
- Check that the screws used that are not supplied with the
product are suitable for the type of object.
- Position the fixing template surface B on the lower part of
the shelf (Fig.8), (considering the minimum distance from the
cooker top).
- Make 6 holes in the cabinet shelf respecting the measurements
indicated (Fig.7).
- Fix the 4 screws A (Fig.9B) without tightening them completely.
- Position the hood under the cabinet, push towards the wall so
the screw heads fully engage in the slots, tighten/fasten the 4
screws A and fix it definitively using the 2 safety screws B.
Installation
Phase 1
Mounting the hood in the lower part of the cabinet 8.2
This product can be installed in 2 different ways:
fig.9B
fig.8
fig.7
Summary of Contents for PVUS930
Page 2: ......
Page 9: ... 9 Technical data 2 2 29 15 16 35 15 16 11 1 3 8 10 1 13 16 3 12 3 1 4 ...
Page 20: ... 20 Control drawing Technical drawing of control board 9 2 ...
Page 28: ... 28 Electrical Assembly ...
Page 29: ... 29 Wiring Diagram ...
Page 32: ... 32 Phase 5 Remove all the screws indicated Motor Phase 5 ...
Page 35: ... 35 Exploded view Models PVUS930 PVUS936 ...
Page 38: ...29 5829 ...