MANUAL FOR PARAGLIDER CHECKS
Line length measurement
Lines should be separated and each line measured under a tension of 5 kg. Measurement
is made from the line karabiner to the canopy according to the method of certification.
Rib numbering begins in the middle of canopy and leads to the wing tip.
Measured full lengths should be documented in the inspection record and are compared
with certified full line lengths protocol. Lengths should not differ by more than 10 mm. The
opposite sides should be checked for symmetry.
Canopy line-attachment points check
Attachment points should be checked for damage and stretching. Defects, loops and flares
should be repaired.
Canopy fabric check
Ribs, diagonal ribs, top and bottom surface should be checked. Any damage to sewing or
tears to the fabric, which could influence flying characteristics must be repaired.
Lines
All lines should be checked for tears, breaks any damage to the sheath or signs of wear.
Special attention should be paid to the sewing of the line loops. Damaged lines must be
replaced.
The results should be documented in the inspection record.
Connector check
All line carabineers, trimmers (if used), speed systems and pulleys should be inspected for
visible damage. Open or improperly secured connectors should be secured in accordance
with the producers recommendations.
Risers
Both risers should be checked for tears, signs of wear or any damage and measured with a
pull of 5 daN strength. Measured data should be documented in the inspection record. The
difference must not be higher then 5 mm when compared to specified lengths.
Final check
The glider sticker and check sticker must be inspected for readability and correctness. The
check must be documented with date, signature and stamp on the canopy and in the user
manual.
TREATING NATURE WITH RESPECT
Finally the call to practise our sport with respect for nature and wildlife! Don't walk outside
marked routes, don't leave any waste, don't make needless noise and respect the sensitive
biological balance in the mountain eco system: especially in the take off area!
Summary of Contents for Eden 5 Series