background image

www.mac-srl.it

4

00_Avvertenze-02 200221

GBR

The  personnel  must use the required D.P.I. in these environments of working.

D.P.I. FOR THE OPERATOR

Pictogram

Description

SHOES

PROTECTION 

GLOVES

SUITABLE 
CLOTHES

GLASSES /

GLASSES FOR 

WELDING

WARNING

•  To do a correct installation of the product, is important to read and follow the instructions below carefully.
•  The company MAC s.r.l  descends any responsibility in the case the manual is not updated.
•  In case of manual or components’ modifi cations, it is at discretion of the customer to ask about them.
•  It is not allowed reproducing partially or publishing this document without the authorization of the company MAC 

S.r.l..

•  Any infraction will be prosecuted in accordance with the procedure prescribed by law.
•  MAC s.r.l.   is exclusive owner of its registered trademark. The brand is affi  xed on labels with CE conformity and 

on seals and danger adhesives. 

•  The removal, cancellation or modifi cation of the label MAC s.r.l.  is strictly forbidden.
•  An improper installation or use of the product may cause damage to people. Everything not expected in these 

instructions is not allowed.

•  The  user  must  abstain  from  any  attempt  to  repair  or  direct  intervention.  Furthermore,  the  user  must  only  call 

qualifi ed and authorized staff .

•  The transit on the bollard must only occur when the device is completely lowered and the traffi  c light is green.
•  Keep  out  of  reach  of  children  remote  controls  or  any  other  device  of  control  in  order  to  avoid  the  accidental 

activation of the automation.

SHIPPING

•  All the products are accurately checked and tested by the manufacturer before the shipping.
•  At  the moment of  delivery,  check  if  the  bollard  has  been damaged  during  the transport. Moreover,  check that 

nothing has been rigged  or  removed.  In  case  of  noticing  damages  or missing  parts,  warn  the courier  and  the 
manufacturer sending them related photo documentation. 

WASTE DISPOSAL

•  MAC s.r.l  recommends to respect the environment by promoting recycling waste.
•  All the components must be disposed following the regulations of the installation’s place.
•  Battery, electric and electronic elements may contain noxious and polluting substances. That components must 

be  removed  and  consigned  to  companies  specialized  in  recycling  noxious  waste  as  indicated  in  the  directive 
2012/19/UE.

TRANSPORT AND LIFTING

•  The transport and lifting of the bollard must occur with specifi c equipment and in compliance with safety regulations 

in force in the area of the product’s installation and by expert staff .

•  Check the effi  ciency and the payload of the transportation before to proceed with the bollard’s movement.
•  To  not  cause  damages  to  people  or  to  materials  it  is  necessary  to  implement  any  possible  precaution.  It  is 

opportune to avoid abrupt movements that may ruin the bollard and cause damages to things or people. 

•  To lift the bollard or its parts, are needed means of transport with a minimum load larger than the declared weight. 

These  means  of  transport  must  have  the  CE  label  with  the  related  certifi cates  in  force,  like  cables  and  lifting 
eyebolts.

•  To have a better load stability, it is necessary to keep the load as low as possible during the movements.  
•  Make sure that there are no people not involved in the work nearby during the installation and its operation. 

Summary of Contents for C275G

Page 1: ...00_FS 00 200221 C275G C200G C140G MANUAL GBR CAREFULLY READ THE MANUAL BEFORE USE Customer Timbre Signature Installing Company Timbre Signature ...

Page 2: ...IMENSIONS 3 WARNING 4 SHIPPING 4 WASTE DISPOSAL 4 TRANSPORT AND LIFTING 4 D P I FOR THE OPERATOR 4 WARNINGS FOR THE MAINTENANCE TECHNICIAN 5 PREPARATION OF THE EXCAVATION 6 BOLLARD LAYING PROCEDURE 7 OPERATION OF ASCENT AND DESCENT 10 GBR SUMMARY ...

Page 3: ...info mac srl it 3 00_FS 00 200221 B D C A C275G A B C D 275 500 481 731 700 931 800 1031 C200G A B C D 200 500 330 735 700 935 800 1035 C140G A B C D 140 500 276 735 700 935 800 1035 GBR DIMENSIONS ...

Page 4: ...s are accurately checked and tested by the manufacturer before the shipping At the moment of delivery check if the bollard has been damaged during the transport Moreover check that nothing has been rigged or removed In case of noticing damages or missing parts warn the courier and the manufacturer sending them related photo documentation WASTE DISPOSAL MAC s r l recommends to respect the environme...

Page 5: ...he non compliance of its products and accessories installation methods The maintenance technician must insert the protections against the indirect contacts upstream of the power line following the regulations in force according to the installation place Check that upstream of the plant there is a differential magnetermic switch with a 0 03 A threshold The control unit main power line must be direct...

Page 6: ...en thought for land with poor draining qualities where digging water is immediately found and or where there is not the possibility to carry everything in a sewer system The bollard will be collocated in a waterproof concrete tank so if the water level raises the bollard remain isolated from the surrounding land This drawing shows how to install a well for the discharge of the excessive water from...

Page 7: ... a well equipped by an emptying system with a greater depth Insert gravel with grain 22 32 mm diameter and 220m height In order to avoid retreats of settling it is advisable to compact the gravel Insert a geotextile layer gr 300 on the compacted gravel Put the PVC pipe diameter of 100 mm and length 200mm in the middle of the dig on the geotextile the PVC pipe is necessary for the passage of the ra...

Page 8: ...in the view from the above N B Position the bollard so as to protrude 20mm from the floor level in order to limit the enter of rainwater in the little well Gradually insert the concrete verifying that the hole is filled uniformly Deal the concrete so as to not to leave empty pockets of air especially below the bollard 1 Screw off the 4 four bolts using the Allen key 2 Extract the trampling platform 3...

Page 9: ...191203 9 u m m 0 00 0 00 0 02 P 02 0 02 P 02 u m m 0 00 0 00 0 02 GBR N B Make the connection N B Remove the protections of polystyrene from the runner Make sure that the concrete is solidified before to insert the extractable structure ...

Page 10: ...rn the key counterclockwise until the stop be careful in the opening mechanism there is a gas spring the bollard goes up Descent of the bollard open the cover on the head of the bollard insert the key supplied push the head of the bollard and at the same time turn the key counterclockwise until the stop be careful in the opening mechanism there is a gas spring lower the bollard by pushing it down ...

Page 11: ...info mac srl it 11 02_IN Palmo_00 191203 GBR ...

Page 12: ...www mac srl it 12 02_IN Palmo_00 191203 GBR ...

Reviews: