OptoLink Handling Instructions
OptoLink A-CCP to OptoLink A-FCR, BCR or CCR receptacle
Step 1: Inspect the connector face and O-rings
Grease the O-rings with Molykote 111 if necessary
Step 2: Inspect the connector surface. If the connector surface is
dirty, follow the OptoLink maintenance instructions overleaf
Step 3: Visually align the key way on the CCP connector with the
key pin tip on the receptacle
before
mating (see picture)
Do not twist the connector to align it during mating
Step 4: Push to mate the connector (see picture)
Step 5: Whilst turning the locking sleeve (see picture)
Note: The connector is only hand tightened
Step 5
Step 4
Step 3
06-2013
Follow these instructions carefully to ensure you get the best out of
your OptoLink connector.
Assembly