CAUTION
To prevent damage to the lift system when lowering
header lift linkages without a header or weight
box attached to the windrower, ensure the float
engagement pin is installed in storage position (B)
and NOT in engaged position (A).
Figure 3.99: Header Float Linkage
CAUTION
Check to be sure all bystanders have cleared the area.
IMPORTANT:
Remove protective cover from exhaust stack prior to
starting engine.
2.
Start the engine and activate the HEADER DOWN
button (A) on the ground speed lever (GSL) to fully
retract header lift cylinders.
IMPORTANT:
If the center-link is too low, it may contact the header
as the windrower approaches the header for hookup.
Figure 3.100: GSL
3.
Activate the reel up switch (A) on the GSL to raise the
center-link until the hook is above the attachment pin
on the header.
Figure 3.101: GSL
147764
51
Revision A