215585
12
Revision A
3.2
Attaching Hitch to Carrier Frame
The connection point on the carrier frame secures the hitch to the frame and allows the pull-type to pivot.
$
Figure 3.9: Carrier Frame
1.
Remove six M20 bolts (A), washers, and nuts from carrier
frame at the hitch attachment location. Retain bolts,
washers, and nuts.
$
%
Figure 3.10: Lifting Hitch
2.
Place sling (A) around the hitch frame. Adjust sling position
until hitch is balanced when lifting.
•
R113 PT
: Approximately 2.7 m (106 in.) from the edge
of tractor end (B) of the hitch
•
R116 PT
: Approximately 3.5 m (138 in.) from the edge
of tractor end (B) of the hitch
3.
Raise the hitch approximately 610 mm (24 in.) off
the ground.
$
%
&
Figure 3.11: Hitch Packing
4.
Cut banding (A) securing wood supports, then
remove supports (B).
5.
Remove two bolts (C) securing wood support to hitch pin.
Discard bolts.