215585
63
Revision A
$
%
&
'
Figure 4.6: Center-Link Anchor
–
Right of Center-Link
7.
Remove cotter pin (B), washer (C), and shipping tag (D)
from pin (A).
NOTE:
Pin (A) should slide out freely. Do
NOT
use a hammer to
remove pin (A).
8.
Adjust the center-link and/or forklift until pin (A) is loose.
$
%
&
Figure 4.7: Center-Link Anchor
–
Right of Center-Link
9.
Adjust the carrier frame so the pin can be installed in the
working location. Install pin (A) and secure with washer (B)
and cotter pin (C).
$
%
Figure 4.8: Top Shield
–
Left of Center-Link
10. Install top shield (B) and secure with four M10 hex head
bolts (A) and flat washers. Torque hardware to 28.5 Nm
(21 lbf·ft).