200 SETUP AND ADJUSTMENTS
Page 7-11
Continuation of Adjustments
1. Using engine barring socket J 38587-A,
manually rotate engine in normal rotation
direction 120 degrees until pointer in
flywheel housing aligns with the “5” mark on
the flywheel. The No. 5 piston will be on the
compression stroke. If engine is equipped
with a pointer on the timing gear cover and
marks on the vibration damper, rotate the
engine until the pointer marked VALVE
aligns with the “5” mark on the vibration
damper. Refer to Figure 7-11.
Figure 7-11 — Engine Crankshaft Rotation
2. Adjust the yoke, valves and slave piston lash
as previously outlined for the No. 1 cylinder.
E7 engine firing order is 1 - 5 - 3 - 6 - 2 - 4.
3. Continue adjusting yokes, valves and slave
cylinder lash for the remaining cylinders, in
firing order, placing each piston 30 degrees
past TDC by rotating the crankshaft and
aligning marks on the flywheel with pointer
marked VALVE and appropriate mark on
vibration damper, if equipped.
[221 GP] INJECTION PUMP
FIXED-TIMING PROCEDURES
Whenever the injection pump is removed from a
MACK E7 engine, it is necessary to set injection
pump-to-engine timing using the fixed-timing
method. This method uses a portable fixed-timing
light which electronically determines port closure
to verify precise injection pump-to-engine timing.
Description
The fixed-timing method is a simple, accurate
procedure which uses a timing light to set
injection-to-engine timing. Using the fixed-timing
method ensures optimum fuel economy and
engine durability, and maintains engine exhaust
within established EPA limits.
Figure 7-12 — Fixed Timing Method
Make sure key is off.
200402a
KE
NT
-MOORE
A
B
PO
W
ER
PO
SIT
IO
N S
EN
SO
R
J 3
7077
5-101.bk Page 11 Friday, March 17, 2006 11:05 AM
Summary of Contents for E7
Page 1: ...E7 ENGINE OVERHAUL AUGUST 1997 ENGINE 5 101...
Page 2: ...Page 0 front fr5 Page 0 Friday March 17 2006 11 04 AM...
Page 5: ...E7ENGINE OVERHAUL MARCH 2006 2 5M REP AUGUST 1997 10M MACK TRUCKS INC 1997 ENGINE 5 101...
Page 13: ...ABOUT THIS MANUAL Page ix ABOUT THIS MANUAL front fr5 Page ix Friday March 17 2006 11 04 AM...
Page 15: ...TABLE OF CONTENTS Page xi TABLE OF CONTENTS front fr5 Page xi Friday March 17 2006 11 04 AM...
Page 24: ...Page xx NOTES front fr5 Page xx Friday March 17 2006 11 04 AM...
Page 31: ...200 SPECIFICATIONS Page 2 1 SPECIFICATIONS 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 55: ...200 ENGINE REMOVAL Page 3 1 ENGINE REMOVAL 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 58: ...Page 3 4 NOTES 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 90: ...Page 4 32 NOTES 5 101 bk Page 32 Friday March 17 2006 11 05 AM...
Page 91: ...200 BENCH PROCEDURES Page 5 1 BENCH PROCEDURES 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 158: ...Page 5 68 NOTES 5 101 bk Page 68 Friday March 17 2006 11 05 AM...
Page 159: ...200 ENGINE ASSEMBLY Page 6 1 ENGINE ASSEMBLY 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 240: ...Page 6 82 NOTES 5 101 bk Page 82 Friday March 17 2006 11 05 AM...
Page 272: ...Page 8 10 NOTES 5 101 bk Page 10 Friday March 17 2006 11 05 AM...
Page 273: ...200 TROUBLESHOOTING Page 9 1 TROUBLESHOOTING 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 292: ...Page 9 20 NOTES 5 101 bk Page 20 Friday March 17 2006 11 05 AM...
Page 293: ...200 APPENDIX Page 10 1 APPENDIX 5 101 bk Page 1 Friday March 17 2006 11 05 AM...
Page 295: ...200 APPENDIX Page 10 3 E7 LUBRICATION SYSTEM 5 101 bk Page 3 Friday March 17 2006 11 05 AM...
Page 296: ...Page 10 4 200 APPENDIX E7 COOLING SYSTEM 5 101 bk Page 4 Friday March 17 2006 11 05 AM...
Page 297: ...INDEX Page 11 1 INDEX INDEX FR5 Page 1 Friday March 17 2006 11 04 AM...
Page 302: ...Page 11 6 NOTES INDEX FR5 Page 6 Friday March 17 2006 11 04 AM...
Page 303: ...E7 ENGINE OVERHAUL PRINTED IN U S A ENGINE 5 101 MACK TRUCKS INC 1997...