 Hoist Start Up and Function Checks 

 

The section below will show how to start up the Hoist for the use of the customer as well as completing some basic functional 
checks to ensure the Hoist is in working order. The images below refer to the TX600, but the same procedure applies to all 
models.   
  

 

Turning the Hoist ON and OFF 

To start up the Hoist the Emergency Lower Tab must be located in the ON position, as the Hoist is delivered to the customer in 
the OFF position. To give power to the Hoist, the tab must be pressed upward vertically as shown in the image below. (Figure 34) 
 
Press any button on the Handset once 

 This should start up the Hoist. The LCD Display should light up Green showing the Home 

Screen Display “Battery 100%”.

 (Figure 35). The LED should also light up green. 

 
 

 
 

 
 
 
 
 
 

 

Operating Controls 

By pressing the UP or the DOWN arrow button on the handset, the carry bar can be raised or lowered to the correct height for 
attaching the sling or positioning an individual. The UP/DOWN functions of the handset buttons are in relation to the travel of 
the hoist. That is, the grey button at the top end of the handset activates the UP motion of the carry bar and the Green button 
activates the DOWN motion (Figure 36).  

 

 
Shown in the image opposite are the 2 functions of the hand controller for the Hoist.

 

 
 
 
 
 
 
 
 

   

 

 

 

 
 
 

It is recommended that the operator hold the carry bar with one hand while raising/lowering is 
being done. This will stop the bar accidentally swaying and/or coming into contact with an 
individual or close object. 
For the same reasons, raise the carry bar above head height when not in use and when traversing 
the unloaded hoist. 

  

UP Function 

DOWN Function 

Figure 36

 

 

Figure 34

 

Figure 35

 

Summary of Contents for TX440-122515

Page 1: ...Doc No 996553 Revision of document A Revision Date 08 04 2021 Commissioning Manual TX Ceiling Track Hoist...

Page 2: ...2 2 Installing Charging Dock Type 2 Track Type 2 9 4 2 3 Installing Charging Dock Type 3 Track Type 3 4 and 5 10 4 3 Installing the Hoist 11 Component Attachment 12 5 1 Attaching the Handset 12 5 2 A...

Page 3: ...on and removal of the hoist for the satisfaction and safety of the customer The Mackworth TX is available in different configerations dependent on track profile The track profiles are shown below When...

Page 4: ...changes in the environmental temperature and humidity during intended use Any commissioning or decommissioning of the Hoist that has not been carried out by an authorised Mackworth personnel will void...

Page 5: ...5mm T Bar Allen wrench 3mm T Bar Allen wrench 4mm T Bar Allen wrench 5mm T Bar Allen wrench 5 5mm combination spanner 8mm combination spanner 13mm combination spanner x2 No 2 Pozi drive screwdriver S...

Page 6: ...22073 4 Hoist Charger 122100 122326 122327 5 Allen Key 4mm 122093 6 User Manual 999553 Using a knife to open the box down the middle the box should open to a similar view to the image on the right It...

Page 7: ...to perform the task safer and easier 1 Remove the end cap from the end of the track Figure 4 2 Using two 13mm spanners loosen the safety bolt and remove the securing nut from the end Figure 5 3 Remov...

Page 8: ...rger in front of the Safety Bolt bumper to achieve maximum track length Figure 9 5 Fix the Charger in place using a 5mm Allen Key to tighten the two bolts Ensure the Charger is positioned straight in...

Page 9: ...Charger wire in a tidy fashion to the closest power supply 7 The Charger block locates into its bracket as shown in figure 16 Raw Plugs and Screws are provided to fix the unit to the wall if desired 8...

Page 10: ...the Charger wire in a tidy fashion to the closest power supply 7 The Charger block locates into its bracket as shown in figure 21 Raw Plugs and Screws are provided to fix the unit to the wall if desi...

Page 11: ...port the Hoist align the Hoist horizontally with the Ceiling Track entrance Figure 23 5 Ensure the charging port is leading into the track The charging port is circled in Figure 24 6 Carefully place t...

Page 12: ...hown in Figure 27 While holding the Airline Connector at the end of the Handset Air Tubes locate the two small metal ribbed pins with the Airline Grommet on the Hoist To correctly locate ensure the pr...

Page 13: ...in figure 32 and place the attachment point into the open hook 3 Pivot the carry bar down to its natural position and release the hooks locking mechanism to secure the carry bar Figure 33 4 Alternativ...

Page 14: ...100 Figure 35 The LED should also light up green Operating Controls By pressing the UP or the DOWN arrow button on the handset the carry bar can be raised or lowered to the correct height for attachi...

Page 15: ...e of the hoist Charging the Hoist The TX Hoist is charged by the charging dock installed in the track A charging dock should have been fitted during the installation of the Hoist To Traverse the TX si...

Page 16: ...ismantling All serviceable components of the Hoist should be dismantled prior to the disposal of the Hoist For guidance on how to dismantle all of the Hoist components refer to the TX Service Manual a...

Page 17: ...rors or omissions Mackworth operates a policy of continuous improvement Specifications and other data are subject to change without notice Dealer service contact details Manufacturer contact details P...

Reviews: