12
Tail installation
13
control system
14
wiring
15
Debugging
16
Commissioning
17
acceptance
18
Cleaning
19
Finish
Notice: fasten the tail.
Notice: the height from floor to the bottom of the control box should be around 1.2
meter and fasten the 4 points.
Notice: distinguish the input and output, also make sure the ground wire is in place.
Notice: all the parameters had well set before delivery in factory.
Notice: Running for 15 minutes, check it whether there is an abnormal sound and
steel wire jitter as well as the current within the rated range.
Notice: provide relevant specification, certificate of approval to customers and inform
the precautions , the customer sign the acceptance sheet at last.
Notice: clean the area after finishing the installation work, customer’s equipments
and subjects should be put in order, bring back all the installation tools and
accessories.