23
IT
EN
FR
ES
6.0 - MAINTENANCE
On completion of the operations described below, repeat the
procedure indicated in paragraph 5.
If the coil and/or connector need to be replaced (see fig. 1 to 3):
• Before performing any operation, make sure that
the device is not electrically powered;
NOTE
: if the coil (
4
) needs to be changed following an
electrical failure, we recommend changing the connector (
3
) as
well. The coil and/or connector replacement operations need to
be carried out taking care to ensure the product’s IP65 rating.
6.1 - REPLACING THE CONNECTOR
• Unscrew and remove the central screw (
2
), then remove the
connector (
3
) from the coil (
4
);
• When you have taken out the existing internal electrical
wiring, wire the new connector and secure it to the coil, as
shown in 3.2
6.2 - REPLACING THE COIL
• Unscrew and remove the central screw (
2
), then remove the
connector (
3
) from the coil (
4
);
• Loosen the screw (
5
) that locks the coil (
4
) and take it out
of the armature assembly (
1
) along with the gaskets/discs;
• Place the new coil + g discs inside the armature
assembly (
1
) and secure with the relative screw;
• Couple the connector to the coil and secure it as indicated
in 3.2;
• If it is necessary to set up the wiring, proceed as described
in 3.2.
NOTE
: No maintenance operations need to be carried out
inside the device.
7.0 - TRANSPORT, STORAGE AND
DISPOSAL
• During transport the material needs to be handled with
care, avoiding any impact or vibrations to the device;
• If the product has any surface treatments (ex. painting,
cataphoresis, etc) it must not be damaged during
transport;
• The transport and storage temperatures must observe the
values provided on the rating plate;
• If the device is not installed immediately after delivery it must
be correctly placed in storage in a dry and clean place;
• In humid facilities, it is necessary to use driers or heating
to avoid condensation.
• At the end of its service life, the product is to be disposed
of separately from other waste (WEEE directive
2012/19/EU) and in compliance with the
legislation in force in the country where this
operation is performed.