53
ENGLISH
GB
Connect the cable to the termi-
nal as follows:
L Brown
N Blue
Yellow/Green
5
Install the five blade holders
6
to the motor of the fan unit
2
by use of two screws per blade
holder.
8
Fit the three lamps (max.
50 W) to the sockets of the lu-
minaire
4
.
11
Connect the cable clip of the
fan unit
2
with the clip on the
luminaire
4
and install the lu-
minaire
4
to the fan unit
2
us-
ing its three screws.
10
Switch on the circuit breaker
of the installation site.
13
Rotate the fan unit
2
until the
rotation latch engages.
7
Install the two pull chains at
the speed and light switch of
the fan unit
2
.
12
At the installation site, drill two
8 mm holes into the ceiling and
insert the wall anchors (not in-
cluded).
3
Switch off the circuit breaker
of the installation site.
1
Connect the cable clips of the
ceiling bracket with the clips
of the fan unit
2
. Install the
cover
1
by attaching it to the
ceiling bracket.
6
Install the five blades
3
to the
motor of the blade holders
6
by
use of three screws per blade.
9
Install the ceiling bracket with
the screw kit. Make sure the
ceiling bracket is securely fas-
tened.
4
Remove the right screw
of the
ceiling bracket screws
5
on
both sides.
2
Summary of Contents for Agestis
Page 56: ......