background image

Page 6 of 10

Assembly Instructions

Step 1:

● Remove tent from oversize carry bag, and then 

   remove the tie strap from around the tent. 

● Insert one end of two Green Coded roof pole into 

   the holes (Green Coded) of plastic mold A1 on 
   Beam Pole1. Make sure the metal spring of the 
   roof pole lock into the plastic.

(Fig.1)

● Insert one end of another two Green Coded roof 

   poles into the holes(Green Coded) of plastic mold 
   A2 on Beam Pole 1. Make sure the metal spring 
   of roof pole lock into the plastic. 

● Insert one end of the remain four Green Coded 

   roof poles into the holes(Green Coded) of plastic 
   mold B on Beam Pole 1.

(Fig.2)

● Hang the S-shaped iron hook on top of the 

   plastic.

(Fig.3) (Fig.4)

FIGURE 1

FIGURE 3

FIGURE 4

FIGURE 2

  Assemble your tent before camping to become familiar with the assembly.

  While setup is possible for one person, two people are recommended.

•  Select a clean level campsite that is free of debris and sharp objects, away from natural watercourse.  

•  Ground cloth is recommended to prolong the life of the tent floor and provide additional insulation 

   and moisture protection. 

• 

Unzip tent doors and windows prior to disassembly to allow air circulation and prevent zipper damage 

•  Seam sealing is recommended for inner stitching of the tent to improve weather resistance. Beware 

  that when applying seam sealing to the outer stitching of the tent, discoloration may occur.

IMPORTANT NOTES BEFORE YOU BEGIN:

B

B

A2

A1

Summary of Contents for FSMGCT2009

Page 1: ...FSMGCT2009 MG LAKEWOOD LODGE 10P TENT Customer Service 888 922 2336 7 00 am to 12 00 am CST daily Live Chat at www academy com Email customerservice academy com Made in Bangladesh...

Page 2: ...formation 10 Page 2 of 10 Note Before assembling the product make sure all parts are present Compare product parts with package content list and hardware content list If any part is missing or damaged...

Page 3: ...ded During assembly poles are under tension If not held in place during assembly poles could break or up possibly causing serious injury Safety glasses may be worn throughout the assembly process as a...

Page 4: ...Purple Coded Plastic mold C1 Green Red And Purple Coded Plastic mold Top Left A1 Green And Silver Coded Plastic mold Top Right A2 Green Coded Plastic mold Top B Green Coded Steel stake G H I J K L M...

Page 5: ...Pole 1 Top Purple Blue Plastic Mold A2 Plastic Mold D Plastic Mold C1 Plastic Mold C Plastic Mold D1 A1 B B A2 C D D1 C1 E E E E C D B B A2 C1 A1 E E E E D1 Purple Red Red Lime Green Lime Green Lime G...

Page 6: ...Fig 2 Hang the S shaped iron hook on top of the plastic Fig 3 Fig 4 FIGURE 1 FIGURE 3 FIGURE 4 FIGURE 2 Assemble your tent before camping to become familiar with the assembly While setup is possible f...

Page 7: ...e other end of roof poles into the holes Green Coded of plastic mold C and D on Beam pole 2 Fig 5 Insert the other end of the remain roof poles into the holes Green Coded of plastic mold E on Beam pol...

Page 8: ...y inserting steel stakes through the rings and webbing loops around then tent floor Hammer stakes into the ground at a 45 angle using a hammer or mallet Making sure to pull tent floor out evenly and s...

Page 9: ...ge your product is by storing it while it is wet Storing a wet tent as short as 24 hours in warm weather is likely to cause mildew on the fabric coatings If you must close camp in the rain open your p...

Page 10: ...aused by the use of other than genuine parts are not covered by this warranty This warranty shall be effective from the date of purchase as shown in the purchaser receipt This warranty is valid for th...

Reviews: