1-800-MAGLINE (624-5463)
Page 61 www.magliner.com
CooLift
®
Area
Description
Method of Inspection
Normal Condition
Findings Pass or
Fail
Timing
Notes
Hydraulics
Fittings not leaking •
Hose fittings inside
enclosure
•
Tube fittings under
enclosure and in frame
•
Cylinder fittings
Wipe around
fittings with dry rag
No leaks (rag remains dry)
Monthly
Hydraulics
Manual operation
Operate hydraulic pump up and down several times manually using pump handle and bypass valve
•
Deck should lift completely within 35 strokes of pump handle
•
Manual bypass valve should allow deck to descend and not leak once re-closed
Monthly
Hydraulics
Cylinder bearing cap is tight
Manual / V
isual
inspection
•
Manually attempt to turn the bear
-
ing cap
•
Inspect to determine if bearing cap
is flush with top of cylinder - should
not see any threads above cylinder body
Monthly
Hydraulics
Fluid level
Visual inspection
Fluid should be about 1/2 inch below top of reservoir when deck is down
Monthly
Suspension
Wheels and casters spin freely
Manual inspection
Wheel should continue to rotate sev
-
eral times before stopping
Monthly
Suspension
Components are straight and undamaged • Front wheel mounting yoke • Main axle • Rear swivel caster frames
Manual inspection
•
Components are not damaged and operate freely
•
Main axle plating is not cracked or damaged
Monthly
Propulsion System
Propulsion system mount screws to frame and deck are tight
Manual inspection
Propulsion system mount screws are tight to frame
Monthly
Propulsion System
Hardware is properly installed and undamaged
Visual inspection
All hardware is in place and in good condition
Monthly
Propulsion System
•
Mounting hardware is properly installed and tightened
•
Chain tension is within acceptable range
Visual inspection
•
No loose or missing fasteners
•
Approximately 1/4” play in chain when pushed between sprockets
Monthly
Area
Description
Method of Inspection
Normal Condition
Findings Pass or
Fail
Timing
Notes
Operator Interface
Internal mounting hardware is tight • V
ertical slide mounting screws
•
Guide block cotter pins in rod
•
Pump mounting plate
•
Pump mounting screws
•
Pump band clamp
•
Battery box mounting screws
Manual inspection
Components are tight to mount
-
ing surfaces
Monthly
Linkage System
Hardware is properly installed and undamaged • Spring pins • W
ashers
•
Springs
Visual inspection
All hardware is in place and in good condition
Monthly
Linkage System
Link pins
Visual inspection
•
Pins are straight with no signs of wear
•
Pin plating is not cracked or damaged
Monthly
Linkage System
Links • Minimal play between pins and bushings • Bushings are not working out of links
Manual / V
isual
inspection
•
Links are straight with no signs of damage or wear
•
Minimal play between pins and links
•
Bushings are flush with side of
the links
Monthly
Linkage System
Link pins are not loose in deck, frame or sync links
Visual inspection
Minimal play between pins and deck, frame and synch links
Monthly
W
elds
No cracked welds
Visual inspection
No cracks or damage
Monthly
W
elds
Front caster plate
Visual inspection
No cracks or damage
Monthly
W
elds
Base plate
Visual inspection
No cracks or damage
Monthly
W
elds
Enclosure
Visual inspection
No cracks or damage
Monthly
W
elds
Frame - general
Visual inspection
No cracks or damage
Monthly
W
elds
Handle cross bar
Visual inspection
No cracks or damage
Monthly
W
elds
Vertical slide rod
Visual inspection
•
Rod is straight with no signs of wear
•
Rod plating is not cracked or damaged
Quarterly