ExpressBox 3400
Power ON the Computer (STEP 9)
Power ON the computer.
Hardware Check (STEP 10)
Check inside the expansion unit and verify all LEDs are correctly illuminated.
chassis will show the following LEDs lit on the backplane and expansion int
Check and verify Backplane LEDs
1. Three Solid Green Power LEDs: +12v, +3.3v and +2.5v
2. One +1V Solid Green
3. One Solid Green LINKUP SLOT 0 LED: D8
Check and verify Expansion Card LEDs
4. Eight Solid Green LEDs on the Expansion Inte
ExpressBox 3400 | Chapter 2 Hardware Installation
(STEP 9)
Check inside the expansion unit and verify all LEDs are correctly illuminated. An operational expansion
on the backplane and expansion interface cards.
Solid Green Power LEDs: +12v, +3.3v and +2.5v
LEDs
Solid Green LEDs on the Expansion Interface card
Magma
Chapter 2 Hardware Installation
22
An operational expansion