D-2000 Series
Revised March 2020
Page | 2-1
SECTION 2: INSTALLATION AND STORAGE
GENERAL
This section contains information required for unpacking, inspecting, and setting up the magnetic particle
inspection unit. Information for preparing the inspection unit for shipment and storage is also included.
INSTALLATION
Location of Unit
Consider the following requirements before selecting a permanent location for the inspection unit:
1. A power source of the proper voltage, frequency and phase (as designated on the
Magnaflux Data
Plate
located on headstock end of inspection unit) capable of providing current per the nameplate.
2. A compressed air supply capable of providing minimum 90-120 psig at 5 cubic feet per minute.
3. A minimum of two feet is required at both ends and the rear of the inspection unit to ensure adequate
space for servicing and ventilation.
4. A firm, reasonably level floor capable of supporting the inspection unit and the materials awaiting
inspection.
5. Adequate space to accommodate a black light inspection hood (Optional), material storage, material
movement and access to the materials.
Unpacking
No special unpacking process is necessary. Observe normal precautions to prevent damage to inspection unit,
and adhere to standard practices for the removal of crating material, protective barrier materials and
preservatives.
Visually inspect the machine and Optional accessories for any apparent shipping damage, and to ascertain
that all accessories ordered have been received. If shipping damage is found, please contact the freight
company to report the damage before contacting Magnaflux Customer Service via phone at 847-657-5300, or
via e-mail at
support@magnaflux.com
.
Leveling
Check the tailstock rails for true level, shimming the legs as required. When the inspection unit is level, secure
it to the floor with a bolt through each leg.
Summary of Contents for D-2000 Series
Page 1: ...D 2000 Series Revised March 2020 Page 1 0 D 2000 SERIES ...
Page 9: ...D 2000 Series Revised March 2020 Page 1 8 PAGE LEFT BLANK INTENTIONALLY ...
Page 20: ...D 2000 Series Revised March 2020 Page 2 11 PAGE LEFT BLANK INTENTIONALLY ...
Page 33: ...D 2000 Series Revised March 2020 Page 3 13 PAGE LEFT BLANK INTENTIONALLY ...
Page 40: ...D 2000 Series Revised March 2020 Page 4 7 PAGE LEFT BLANK INTENTIONALLY ...
Page 45: ...D 2000 Series Revised March 2020 Page 5 5 PAGE LEFT BLANK INTENTIONALLY ...
Page 48: ...D 2000 Series Revised March 2020 Page 6 3 PAGE LEFT BLANK INTENTIONALLY ...