32. Bring down the top curtain, carefully working the opening around the fan vent as shown in Figure 7-25.
33. Locate the front curtain and hang it from the front track with hooks as shown in Figure 7-26 below. Once
the front curtain is installed, pull down the curtain with “Magnaflux” on it to block white light from entering
the inspection booth. This “Magnaflux” curtain is shown in Figure 7-27 below.
Figure 7-26
Figure 7-27
34. The front curtain can be folded in half for extra ventilation. Fold in half and mount the lower eyelets on
the same hook already supporting the curtain. Verify white light levels inside the inspection booth are
still acceptable if this is done.
Figure 7-24
Figure 7-25
Summary of Contents for D-2000 Series
Page 1: ...D 2000 Series Revised March 2020 Page 1 0 D 2000 SERIES ...
Page 9: ...D 2000 Series Revised March 2020 Page 1 8 PAGE LEFT BLANK INTENTIONALLY ...
Page 20: ...D 2000 Series Revised March 2020 Page 2 11 PAGE LEFT BLANK INTENTIONALLY ...
Page 33: ...D 2000 Series Revised March 2020 Page 3 13 PAGE LEFT BLANK INTENTIONALLY ...
Page 40: ...D 2000 Series Revised March 2020 Page 4 7 PAGE LEFT BLANK INTENTIONALLY ...
Page 45: ...D 2000 Series Revised March 2020 Page 5 5 PAGE LEFT BLANK INTENTIONALLY ...
Page 48: ...D 2000 Series Revised March 2020 Page 6 3 PAGE LEFT BLANK INTENTIONALLY ...