3) The encoder should be wired to the drive as follows:
Table 1 CL: PG-X3 Encoder connections
•
IP is the +VDC, and IG as the common.
•
The encoder voltage is selected via the jumper CN3 as either 5.5V or 12V
•
Note that the encoder is wired in to the upper case terminals. The lower case terminals are an output
from the drive
and won’t necessarily be used.
•
If wired single ended, PG Card Detect (F1-20) must be Disabled
Hoistway Parameter Set-up
4) Enter / verify the following parameters:
•
CONTRACT CAR SPD (O1-25)
parameter should be the lift contract speed in m/s. This can be verified
with a hand tachometer if required and adjusted if required.
•
CONTRACT MTR SPD (O1-26)
parameter should be set to the RPM that is required to make the lift travel
at contract car speed
NOTE:
The above two parameters are utilised by the drive for many purposes regarding speed control of the lift,
therefore its important these are set correctly prior to continuing any further.
Input Voltage
5) Enter the Line Voltage:
•
INPUT VOLTAGE (E1-01) parameter should be set to the measured incoming phase to phase
voltage.