6/2/2010
Page 13 of 25
Electrobar 8-Bar Instruction Manual
005-1044-R8
Chapter 6.0: Hanger Assembly
6.1:
Install hanger clamps securely to mounting brackets leaving clamping bolts loose.
6.1.(a):
Make sure conductor bar openings are straight along runway path.
Note: Snap-in type hangers do not have clamping bolts.
Maximum hex nut torque for nylon hanger
is 65 inch pounds
. Use steel bolt hanger on all high temperature cover applications.
6.2: Anchor
Hangers
Note: Anchor hangers should be used at the midpoint between expansion gaps (see page 9) and at the
midpoint on all other systems. Anchor hangers should also be used where conductor movement
must be restricted. Install anchor hangers according to the following directions.
Figure E
Anchor Hanger
Universal 8-Bar
6.3:
8-HA for Universal 8-Bar Systems (see figure A, page 6)
6.3.(a):
Insert conductor section into the clamp assembly. Install an Anchor Hanger on both
sides of a hanger clamp assembly.
6.3.(b):
Drill 3/16” hole through the hanger and conductor section, using the pre-drilled hole in
the anchor hanger as a guide.
6.3.(c):
Drive the nylon pin into the hanger and through the conductor bar section. The pin
should penetrate out the other side of the hanger.
Note: Begin with the conductor run that is the closest to the runway beam or support structure, then
work to the outside run.
3/16” x 1” Long
Nylon Pins