Pedestrian Barrier High Door MPH 112
Maintenance
5817,5005EN / Version 01
79
12.3 Maintenance schedule
The following describes the maintenance work that is necessary for
optimal, trouble-free operation. Maintenance intervals must be
observed.
If increased wear of individual components or functional groups is
revealed during regular inspections, the operator must reduce the
required maintenance intervals on the basis of the actual signs of
wear.
In case of queries regarding the maintenance work and intervals:
contact the manufacturer (service address
Page 2).
Interval
Maintenance work
To be carried out by
Check all glass parts for damages and sharp
edges.
Operator
Monthly
Visual inspection of the housing in and outside for
damage. If necessary, clean housing and correct
defect in paint work.
Specialist
Check fixing of the glass wings.
Operator
Check function of the residual current operated
device
Electrical specialists
Every 6 months
Check function of safety installations as e.g. light
barriers.
Electrical specialists
Check electric cables for damages.
Electrical specialists
Check if all electrical connections are firm.
Electrical specialists
Check rubber buffers and replace if necessary.
Specialist
Check signs and labels for legibility.
Operator
Every 12 months
Check foundation fastening.
Specialist
Table 13: Maintenance schedule