Pedestrian Pivot Barrier
MPP-112 / MPP-122 / MPP-132 / MPP-212 / MPP-222
Assembly and installation
34
5817,0016EN / Version 00
7.3.1 Foundation plan MPP-112, MPP-132 and MPP-212
Mag00425a
ca.196
min.
180
40
360
min.
min. 560
800
ca. 244
min. 180
min. 180
1
5
4
3
2
6
6
36
76
65
145
A
90
20
50
172
79 157
157 79
40
40
53
53
40
min.
180
B
90
80
280
280
720
Æ
8
A
90
90
264
480
B
Æ
8
264
Fig. 9: Foundation plan MPP-112, MPP-132 and MPP-212,
here illustrated MPP-112 (dimensions in mm)
For indoor applications, reinforcement is not required.
1
Foundation level and horizontal
2
Foundation depth: at least 800 mm, frost-protected
foundation depth to be adjusted to the local situation.
3
Concrete (C25/30) or corresponding continuous industrial floor.
In case of flagging make sure that the foundation anchors are
secured firmly in the foundation. If necessary, use longer anchors.
4
Foundation anchors M12x145, tightening torque: 50 Nm,
Diameter drilling hole 12 mm, drilling hole depth 90 mm
5
Have cables overlapping for approx. 2 m of the conduits
6
Empty conduits for mains supply and control line
Inner diameter 20 mm each