Operating Instructions
581E,5811_07
10
Concrete PC 250
with iron reinforcement
srew
split washer
washer
washer
socket
bearing neck
bearing
empty conduit
O 25 mm
Foundation, smoothed finish
to be positioned in water
in a level and horizontal manner
Lay seperate conduits for
power supply and data cables,
50 mm approx. above foundation
All power supply and
data lines are to be 5 m at least
above the empty conduit
After mounting
glue set screw with LOCTITE 241
or similar
Fig.4