45
mTripod
Installation and assembly
2
3
1
5
4
7
6
M
ag0092
7
Fig. 13: Mounting and preparing the base plate
1 Foundation / raw floor
2 Planned finished floor
3 Drilling template
4 Nut M8, slightly above the planned finished floor (FMTP-ML: 8 x and FMTP-MS: 6 x)
5 Threaded rods M8 x 210, stainless steel (FMTP-ML: 8 x and FMTP-MS: 6 x)
6 Nut M8 (FMTP-ML: 8 x and FMTP-MS: 6 x)
7 Base plate
Summary of Contents for MHTM FlowMotion mTripod
Page 6: ...6 mTripod...
Page 78: ...78 mTripod...
Page 81: ...81 mTripod...
Page 82: ...82 mTripod...
Page 83: ...83 mTripod...