34
mTripod
Installation and assembly
7.4.3
Setting up foundation and placing empty conduits
1. Excavate the foundation hole according to the foundation and empty
conduit plan.
ä
ä
2. If installed outdoors, lay the reinforcement braid.
3. Place empty conduits according to the foundation and empty conduit plan
in the foundation hole.
4. Close empty conduit to prevent water from entering.
5. Concrete the foundation.
6. Create smooth coating.
7. Let concrete cure.
8. Apply moisture protection for outdoor installation.
Summary of Contents for MHTM FlowMotion mTripod
Page 6: ...6 mTripod...
Page 78: ...78 mTripod...
Page 81: ...81 mTripod...
Page 82: ...82 mTripod...
Page 83: ...83 mTripod...