background image

ME-PT1 Instruction Sheet

© 2014 Magnum Energy, Inc.

Figure 1, ME-PT1 to ME-AGS-N Installation

12-volt

DC supply

fu

se

12-volt

DC supply

fu

se

ME-AGS-N

External

Maintain Switch

External

Momentary Switch

ME-RC

 One time push 

(or close): gen runs 

for duration of run 

time cycle, then stops.

ME-ARC

 Press switch: 

gen runs for 2 

minutes, then stops.

Coleman Air Conditioner Zone Control Box

ON

OFF

ME-ARC

 Switch set 

to ON: gen runs until 

switch set to OFF. 

Switch set to OFF: 

gen runs for 2 mins., 

then stops. 

ME-RC

 Switch set to 

ON: gen runs until 

switch set to OFF. 

Switch set to OFF: gen 

runs for remaining 

duration of run time 

cycle, and then stops.

options

PT1-AGS

To Network port on 

Magnum inverter

All grounds must be bonded 

together to ensure the ME-PT1 

works correctly

GEN connection 

pr12VDC 

from Zone Control 

Box when gen 

needs to start.

GEN

connection

GREEN (GND)

WHITE (L2)

BLACK (L1)

ZONE CONTROL BOX

115 VAC IN

9

-PI

N

 PL

U

G

 T

O

 

U

PPE

R

 U

N

IT

FREEZE ROOM HEAT

SHED

COOL

SHED

TO

 U

S

E W

IT

H

 

LO

AD

 S

H

E

D

 

D

EVI

C

E R

EM

O

VE

 

JU

M

P

E

R

 A

N

D

 

CO

N

N

ECT

 T

O

 

N

.C

. CO

N

T

A

TCT

ROOM

SENSOR

FR

EE

ZE

 S

EN

S

O

R

ME-PT1

ME-ARC
A. Using a momentary type switch: Pressing the switch causes the generator 

to run for two minutes, and then stop.
B. Using a maintain type switch: If the switch is set to ON, the generator 

continues to run until the switch is set to OFF. Once the switch is set to OFF, 

the generator will run for two minutes, and then stops.

Summary of Contents for ME-PT1

Page 1: ...ion To install the ME PT1 refer to Figure 1 and the steps below 1 Connect the red wire on the ME PT1 adapter to a 12 volt DC external switching device i e switch 2 Plug the ME PT1 adapter into the REMOTE purple port on the ME AGS N Info The remote temperature sensor that comes with the ME AGS N normally plugged into the AGS s REMOTE port is not used when a ME PT1 is connected Setup When using the ...

Page 2: ...ion of run time cycle and then stops options PT1 AGS To Network port on Magnum inverter All grounds must be bonded together to ensure the ME PT1 works correctly GEN connection provides 12VDC from Zone Control Box when gen needs to start GEN connection GREEN GND WHITE L2 BLACK L1 ZONE CONTROL BOX 115 VAC IN 9 PIN PLUG TO UPPER UNIT FREEZE ROOM HEAT SHED COOL SHED TO USE WITH LOAD SHED DEVICE REMOVE...

Page 3: ... the phone splitter s ports and then plug the remote switch using its communications cable into the phone splitter s other port 3 Connect the red wire on the ME PT1 adapter to a 12 volt DC external switching device i e switch Temperature Sensor Temperature Sensor cut open Figure 2 Locating Sensor Figure 3 Sensor Cut Open Setup 1 On the ME AGS S turn the START TEMP F adjustment clockwise to any tem...

Page 4: ... current RUN TIME HOURS cycle has been satisfied options GEN connection provides 12VDC from Zone Control Box when gen needs to start GEN connection GREEN GND WHITE L2 BLACK L1 ZONE CONTROL BOX 115VAC IN 9 PIN PLUG TO UPPER UNIT FREEZE ROOM HEAT SHED COOL SHED TO USE WITH LOAD SHED DEVICE REMOVE JUMPER AND CONNECT TO N C CONTATCT ROOM SENSOR FREEZE SENSOR PT1 AGS Phone Splitter 6 conductor ME AGS S...

Reviews: