©
2010 Magnum Energy, Inc
.
6
2.0 Installation
2.0 Installation
Pre-Installation
Before installing the inverter, read
the entire Installation section. The
more thorough you plan in the beginning, the better your inverter
needs will be met.
WARNING:
Installations should be performed by quali
fi
ed
personnel, such as a licensed or certi
fi
ed electrician. It
is the installer’s responsibility to determine which safety
codes apply, and to ensure that all applicable installation
requirements are followed. Applicable installation codes
vary depending on the speci
fi
c location and the type of
installation.
Info:
Review the “Important Product Safety Information”
on page ii and the “Important Battery Safety Instructions”
on page iii before any installation.
The basic system diagram shown in Figure 6
should be reviewed to
assist you in planning and designing your installation.
Unpacking and Inspection
Carefully remove the MM-AE Series inverter/charger from its ship-
ping container and inspect all contents. Verify the following items
are included:
−
MM-AE Series inverter/charger
−
Red and black DC terminal covers
−
AC access cover with two screws
−
Two 1/2” hex-head kep nuts (installed on the DC terminals)
−
Battery Temperature Sensor (BTS)
−
MM-AE Series Owner’s Manual
If items appear to be missing or damaged, contact your authorized
Magnum Energy dealer or Magnum Energy.
If at all possible, keep your shipping box. It will help protect your
inverter from damage if it ever needs to be returned for service.
Save your proof-of-purchase as a record of your ownership; it will
also be needed if the unit should require in-warranty service.
Record the unit’s model and serial number in the front of this manual
in case you need to provide this information in the future. It is much
easier to record this information now, instead of trying to gather it
after the unit has been installed.