Model TE100
Electronic Small Bagging Scale
x Revision
001
Figure 7-5. Checking Load Cell Alignment (As Viewed From The Top Of The TE100) .................... 7-6
Figure 7-6. Shut Off Gate Mounting .................................................................................................. 7-9
Figure 7-7. Shut Off Gate Mounting Screw Ground Off Smooth........................................................ 7-9
Figure 7-8. Shut Off Gate Seal......................................................................................................... 7-10
Figure 7-9. Stainless Steel Deflector ................................................................................................ 7-11
Figure 7-10. Bag Clamp Arm Bolts and Bearings ............................................................................ 7-11
Figure 7-11. Bag Clamp Arm Bolts And Bearings Installed ............................................................. 7-12
Figure 7-12. Bag Clamp Pivot Block ............................................................................................... 7-14
Figure 7-13. Air Supply Fitting ....................................................................................................... 7-15
Summary of Contents for TE100
Page 1: ...Taylor Products Model TE100 Electronic Small Bagging Scale Operation and Maintenance Manual ...
Page 6: ...Model TE100 Electronic Small Bagging Scale iv Revision 001 This Page Intentionally Left Blank ...
Page 86: ......
Page 88: ......
Page 90: ......
Page 91: ...Machine Type TE100 Dwg Name ISO 4 dwg Dwg View Scale Cabinet Exploded View ...
Page 92: ......
Page 95: ...Machine Type TE100 Dwg Name ECT146ASY dwg Dwg View Controller Circuit Board ...