Repair
Model TE100
Electronic Small Bagging Scale
7-2 Revision
001
9. Install the spout. Refer to 7.3.1 Spout Replacement.
10. Install the start switch.
11. Connect the air supply lines to the bag clamp cylinder quick connect fittings.
12. Connect the main electrical and pneumatic connections.
13. Turn the TE100 on and test for proper operation.
7.2.2 Shut Off Gate Adjustment
1. Turn the TE100 off.
2. Disconnect the main electrical and pneumatic connections.
3. Disconnect the air supply lines from the bag clamp cylinder quick connect fittings.
4. Remove the start switch.
5. Remove the spout. Refer to 7.3.1 Spout Replacement.
6. Inspect the rubber shut off gate seal for wear or damage. Replace if necessary. Refer to 7.3.7
Shut Off Gate Seal Replacement.
7. Loosen the jam nut on the shut off gate cylinder rod.
8. Turn the cylinder rod in the rod end to adjust the amount of contact between the edge of the shut
off gate and the shut off gate seal.
Figure 7-2.
Shut Off Gate Adjustment
9. Tighten the jam nut against the rod end.
10. Install the spout. Refer to 7.3.1 Spout Replacement.
11. Install the start switch.
12. Connect the air supply lines to the bag clamp cylinder quick connect fittings.
13. Connect the main electrical and pneumatic connections.
14. Turn the TE100 on and test for proper operation.
Shut off gate
cylinder
Shut off gate
cylinder rod
Shut off gate
cylinder rod jam
nut
Shut off gate
cylinder rod end
Shut off gate
Summary of Contents for TE100
Page 1: ...Taylor Products Model TE100 Electronic Small Bagging Scale Operation and Maintenance Manual ...
Page 6: ...Model TE100 Electronic Small Bagging Scale iv Revision 001 This Page Intentionally Left Blank ...
Page 86: ......
Page 88: ......
Page 90: ......
Page 91: ...Machine Type TE100 Dwg Name ISO 4 dwg Dwg View Scale Cabinet Exploded View ...
Page 92: ......
Page 95: ...Machine Type TE100 Dwg Name ECT146ASY dwg Dwg View Controller Circuit Board ...