13
SECTION 3. OPERATION AND MAINTENANCE
This section contains powering, operating, and maintenance procedures. Ensure the Excella is
installed and cabling and power are connected as described in Section 2.
POWER UP
Plug the power supply, P/N 64300098P/N, and cord 71100001, into wall power, and press the
start button. The green LED in the middle of the unit should light.
OPERATION
Check Insertion
Enter checks (one check at a time) as indicated in Figure 3-1. The left entry port light will blink
when a check is requested.
Figure 3-1. Position for Holding and Entering Check
Summary of Contents for EXCELLA STX
Page 6: ...vi APPENDIX D LICENSE AND COPYRIGHT 37 3 Amount Field 36 4 Auxiliary On Us Field 36...
Page 8: ...Figure 1 1 Excella STX viii...
Page 12: ...Excella STX Installation and Operation 4...
Page 20: ...Excella STX Installation and Operation 12...
Page 28: ...Excella STX Installation and Operation 20...
Page 47: ...39...